(16, 8, 36), (28, 11, 48), (12, 7 ,32) are 3 set of integers according to some mathematical operations, a similar set based on the similar operations are
Two taps can separately fill a cistern in 10 min. and 15 min. respectively and when the waste pipe is open, they can together fill it in 18 min. The waste pipe can empty the full cistern in
OPtion
1) 7 min
2) 27 min
3) 9 min
4) 14 min
5) 13 min
6) 23 min
7) 12 in
8) 18 min
9) 21 min
10)15 min
Solution
Work done by waste pipe in 1 min
(1/10 + 1/15) - 1/18
10/90 = 1/9
Therefore
The waste pipe can empty the full cistern in 9 min.
Option 3)
The sum of all digits of a 5 digit number is equal to the number of two digit formed by using the ten thousands and hundreds place digit in order. If five digit number has 1, 2, 3, & 4 and no digit is repeated in the number, then total number of possible number are
Let us suppose that
fifth digit is x
then according to given condition
1+2+3+4+x = y
10+x = y
Since x is a single digit integer
& 0 =< x =< 9
10 =< y =< 19
& repetetion is not allowed
So Possible number are 12x34 where possible x are 0, 5, 6, 7, 8, 9
Ten Thousands digit will necessarily be 1 & hundred x
so order 3 can be arranged in 3! = 6 ways
So possible numbers = 6*6 = 36
Option 5)
Rupendra forms a wall in 10 days and Shailendra forms it in 15 days. Rependra and Shailendra start the work of forming wall together but after 2 days Rupendra leaves the work. How many days are required for making the remaining wall by Shailendra?
One day work of Rupendra = 1/10
One day work of Shailendra = 1/15
One day work of R and S = 1/10 + 1/15
= 1/6
After 2 days of work remaining work = 1- (2*1/6) = 4/6
No. of days required by S for doing this work = (4/6) / (1/15)
= 10
Two buses travel to a place at 45 kmph and 60 kmph respectively. If the second bus takes 11/2 hours less than the first for the journey, the length of the journey is
OPtion
1) 900 km
2) 875 km
3) 945 km
4) 1050 km
5) 1350 km
6) 1260 km
7) 990 km
8) 1400 km
9) 1100 km
10)1150 km
Solution
Let the length of journey be x km. Then,
x/45 - x/60 = 11/2
990 km
Option 7)
Rajesh and Mohan working separately can do a piece of work in 9 days and 12 days respectively. If they work for a day alternately, Rajesh beginning, in how many days, the work will be completed?
(Rajesh+Mohan)'s 2 day's work = 1/9 + 1/12 = 7/36
Work done in 5 pair of days = (5*7/36) = 35/36
Remaining work = (1 - 35/36) = 1/36
On 11th days it is Rajesh's Turn
1/9 : 1/36 :: 1 : x
x = 1/36 * 1 * 9
= 1/4 days
Therefore
Total time taken 10 1/4 = 41/4 days
amcat ques , guys help me what is the value of these
log0.2 base 5
amcat
A MAN IS LIKE A FRACTION WHOSE NUMERATOR IS WHAT HE IS AND WHOSE DENOMINATOR IS WHAT HE THINK ABOUT HIMSELF LARGER THE DENOMINATOR SMALLER THE FRACTION